Kuching International Airport

Kuching International Airport
KCHWBGG

Kuching International Airport

Kuching, Malaysia · Asia
Asia Asia/Kuala_Lumpur
19direct destinations
9airlines
1runway
3,780 mLongest runway
1950opened

Kuching International Airport (KIA) (IATA: KCH, ICAO: WBGG) is an international airport serving the entire southwestern region of Sarawak, Malaysia. It is located 11 km (6.8 mi) south of Kuching city centre. The airport is colocated with the RMAF Kuching Air Base, home to the No. 7 Squadron RMAF. The airport terminal is capable of handling five million passengers per annum and it is the fourth busiest airport in Malaysia. KIA has grown rapidly with an increasing number of passengers and aircraft movement. In 2025, KIA handled 5,763,279 passengers with a corresponding volume of 50,194 flights. In the same year, 47,836 metric tonnes of cargo were handled through this facility. KIA currently serves as the main hub for its own regional airline, AirBorneo, as well as one of the main operating bases for AirAsia and has been growing rapidly to tackle the demand of the travellers in the Sarawak region.

Location

Mapa

1.487°N, 110.353°E · 27 m s. n. m. (89 ft)

General data

CountryMalaysia
CityKuching
Coordinates1.487°N, 110.353°E
Elevation27 m s. n. m. (89 ft)
Time zoneAsia/Kuala_Lumpur
Longest runway3,780 m
Opened1950
Direct destinations19

Runways · 1

07/25
Length3,780 m12,402 ft
Width46 m151 ft
SurfaceAsphalt
Lighted✓

Lengths and surfaces from the public OurAirports register; open runways only.

Radio frequencies · 5

Tower

118.100

Ground

121.900

ATIS (automatic information)

128.400

Approach

120.200APP DIRECTOR

Area control (center)

134.500RDR
Look for a live feed on LiveATC External site; not every airport has a feed.

Reference frequencies for enthusiasts, from OurAirports (community database, public domain), checked on Oct 16, 2026. They may be outdated or incomplete and do not replace the AIP or current charts: not for navigation. In Europe the published frequency may be an 8.33 kHz channel (e.g., 118.505 for 118.500). In MHz.

History

An airstrip in Kuching was first constructed at 7th Mile (Bukit Stabar) in 1938, measuring 700 yards (640 m) long by 300 yards (270 m) wide. An airport terminal building was later completed and opened for use on 26 September 1950. The airport consisted of a small L-shaped single-storey passenger terminal, a small cargo facility, and an airport fire station. Air Traffic Control Tower, Meteorological Service and Maintenance building were clustered in one area, a small apron of four parking bays and a single runway which was 1,372 metres long and 46 metres wide. Navigational (Directional Finding Equipment) and Radio Aids were installed at the airport. Kuching International Airport then became the gateway to Sarawak, Brunei and North Borneo (Sabah as it is called today) with the introduction of once weekly Douglas Dakota twin-engined piston aircraft services originating from Singapore by Malayan Airways. By the end of 1954, scheduled air services into Kuching International Airport grew by leaps and bounds. This was depicted in the 1954 statistics which recorded 1,550 aircraft movements, 13,564 passengers, 95,911 kilogrammes of cargo and 25,984 mails. In 1959, the runway was extended to 1,555 metres in length to make way for Vickers Viscount turboprop aircraft operations. In 1962, the runway was extended once more to a length of 1,921 meters to facilitate DeHavilland Comet-4 turbojet aircraft operations. The terminal was also enlarged in the same year. A Control Zone was established at Kuching in November as a part of a plan to provide an Air Traffic Control Service commensurate with the growth of air traffic. Malayan Airways Limited operated the Singapore / British Borneo Territories Regional Services with Vickers Viscount and Douglas DC-3 aircraft, daily schedules linked Kuching and Sibu with Singapore on the other side; and connection via Borneo Airways to Brunei and Borneo on the other. In 1971, the Malaysian Government (as Sarawak joined the Federation of Malaysia on 16 November 1963) engaged a team of Canadian Consultants to make a Master Plan study of Kuching International Airport. In December 1972, the government accepted the Consultant's report. Among the recommendations were: The extension and strengthening of existing runway to enable operations by larger jet-powered aircraft The construction of a new terminal building on the north site of the runway Work on the strengthening and extension of the runway to 2,454 metres (8,051 ft) in length started in 1973 and was completed in 1976, capable of handling Boeing 707 turbofan aircraft. In 1980, consistent with the advent of Airbus A300B4 operations, it was imperative that the runway pavement strength be upgraded to meet the requirements of that particular aircraft. Work on this was completed in early 1982. Construction of the terminal complex at the north site took a centre stage at the end of 1978 and was completed in July 1983. This modern terminal replaced the previous terminal, and was opened for business on 24 August 1983. The terminal complex covered a built-up area of 81 hectares with a floor space of 13,000 square metres, comprised the three-storey passenger terminal flanked by neatly planned buildings which consisted of the Air Traffic Control Tower and operations block, a larger freight facility, a new airport fire station, Maintenance Building, VIP Building and ancillary services building. An extension of the airport, consisting of extending the existing runway to accommodate "jumbo jets", reconstruction of the existing terminal was planned in 1991, costing RM 240 million, with the runway extension taking 60% of the total cost. It was planned to be completed in 1994. As of 1999, two foreign airlines (Singapore Airlines and Royal Brunei Airlines) from both Singapore and Brunei as well as Malaysia's national carrier and as many as eight private general aviation companies operated scheduled services into and out of Kuching International Airport.

Airlines operating here · 9

Other airlines with direct routes

Airlines with current passenger routes from here, according to Wikipedia route tables cross-checked from both ends (October 2026).

Photo: Craig 02:47, 5 October 2007 (UTC) · Public domain · view original

Data from OurAirports (public domain) · destinations and airlines from Wikipedia route tables (CC BY-SA, 2026), unless another source is given · profile and photo from Wikidata/Wikimedia Commons (CC0 / CC) · summary and history from Wikipedia (CC BY-SA).

Cite

To cite this page in academic work, an article or Wikipedia, choose the style and copy the reference. The access date is today.

This page was last updated on October 15, 2026

APA

Vuelopedia. (2026, October 15). Kuching International Airport (KCH). Retrieved October 16, 2026, from https://vuelopedia.org/en/airport/KCH

MLA

“Kuching International Airport (KCH).” Vuelopedia, Fundación Poderia, 15 Oct. 2026, vuelopedia.org/en/airport/KCH. Accessed 16 Oct. 2026.

Chicago

Vuelopedia. “Kuching International Airport (KCH).” Fundación Poderia. Last modified October 15, 2026. https://vuelopedia.org/en/airport/KCH.

Harvard

Vuelopedia (2026) Kuching International Airport (KCH). Available at: https://vuelopedia.org/en/airport/KCH (Accessed: 16 October 2026).

BibTeX

@misc{vuelopedia_en_airport_kch,
  author       = {{Vuelopedia}},
  title        = {{Kuching International Airport (KCH)}},
  publisher    = {Fundación Poderia},
  year         = {2026},
  date         = {2026-10-15},
  url          = {https://vuelopedia.org/en/airport/KCH},
  howpublished = {\url{https://vuelopedia.org/en/airport/KCH}},
  urldate      = {2026-10-16},
  note         = {Accessed 2026-10-16}
}

Wikipedia

{{cite web |url=https://vuelopedia.org/en/airport/KCH |title=Kuching International Airport (KCH) |website=Vuelopedia |publisher=Fundación Poderia |date=2026-10-15 |access-date=2026-10-16 |language=en}}