Kempegowda International Airport Bengaluru

Kempegowda International Airport Bengaluru
BLRVOBL

Kempegowda International Airport Bengaluru

Bengaluru, India · Asia
Asia Asia/Calcutta IVCA 53.0
109direct destinations
37airlines
2runways
4,000 mLongest runway
2008opened

Kempegowda International Airport (IATA: BLR, ICAO: VOBL) is an international airport serving Bengaluru, the capital of the Indian state of Karnataka. Spread over 16 square kilometres (6.2 sq mi), it is located about 35 km (22 mi) north of the city, near the suburb of Devanahalli. It is owned and operated by Bengaluru International Airport Limited (BIAL), a public–private consortium. The airport opened in May 2008, as an alternative to the increasingly congested HAL Airport, the original commercial airport serving the city. It is named after Kempe Gowda I, the founder of Bengaluru. It is Karnataka's first fully solar powered airport, developed by CleanMax Solar. The airport is the third-busiest in India, behind the airports in Delhi and Mumbai. It is the 26th busiest airport in Asia and the 54th busiest airport in the world as of 2024. In FY2025-26, the airport handled over 44.47 million passengers and 532,012 tonnes (586,443 short tons) of cargo. The airport offers connecting flights to all 6 inhabited continents, and direct flights to 5. The airport has two passenger terminals that handle both domestic and international operations, and two runways, the second of which was commissioned on 6 December 2019. The second terminal was inaugurated by Prime Minister Narendra Modi on 11 November 2022. There is also a cargo village with 3 cargo terminals.

Location

Mapa

13.198°N, 77.706°E · 914 m s. n. m. (3.000 ft)

General data

CountryIndia
CityBengaluru
Coordinates13.198°N, 77.706°E
Elevation914 m s. n. m. (3.000 ft)
Time zoneAsia/Calcutta
Longest runway4,000 m
Opened2008
Direct destinations109

Runways · 2

09L/27R
Length4,000 m13,123 ft
Width45 m148 ft
SurfaceAsphalt
Lighted✓
09R/27L
Length4,000 m13,123 ft
Width45 m148 ft
SurfaceAsphalt
Lighted✓

Lengths and surfaces from the public OurAirports register; open runways only.

Radio frequencies · 4

Tower

124.350

Ground

121.650

ATIS (automatic information)

128.675

Approach

121.250
Look for a live feed on LiveATC External site; not every airport has a feed.

Reference frequencies for enthusiasts, from OurAirports (community database, public domain), checked on Oct 16, 2026. They may be outdated or incomplete and do not replace the AIP or current charts: not for navigation. In Europe the published frequency may be an 8.33 kHz channel (e.g., 118.505 for 118.500). In MHz.

History

Planning (1991–2004)

The original airport serving Bengaluru was HAL Airport, located 5 kilometres (3.1 mi) from the city centre. It was the primary airport in the city until 2008. Originally established in 1942 for military and defence purposes, HAL began domestic operations for the first time in the late 1970s. The unexpected popularity of newly offered domestic flights encouraged rapid expansion of the airport. In the late 1990s, the first international services began, with Air India flights to Singapore. In 2000, the first foreign carrier, Royal Nepal Airlines, commenced operations with flights to Kathmandu, followed by Lufthansa's A340 service to Germany a year later. Several other major international carriers such as British Airways and Air France started serving the old airport by 2005.

An expansion of the airport's international terminal was impossible, since there was no space in the surrounding environment, and the airport apron could only park six aircraft. In March 1991, former Chairman of the National Airports Authority of India (NAAI), S. Ramanathan, convened a panel to select a site for the new airport. The panel decided on Devanahalli, a village about 30 kilometres (19 mi) north of Bengaluru. The State Government drafted a proposal to build the airport with private assistance, which the Union Government approved in 1994. In 1995, the Airports Authority of India (AAI) and the Government of Karnataka decided to call for international consortia to own, build and operate the new greenfield airport.

In December 1995, a consortium made up of the Tata Group, Raytheon and Singapore Changi Airport signed a memorandum of understanding (MoU) with the State Government regarding participation in the project. In June 1998, however, the consortium announced it was pulling out of the project due to delays in government approval. These included disputes over the location of the new airport and the fate of HAL Airport.

In May 1999, the Airports Authority of India (AAI) and the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) signed a memorandum of understanding (MoU) regarding the project. It would be a public–private partnership, with AAI and KSIIDC holding a 26% share and private companies holding the remaining 74%. In January 2001, the State Government created the company Bengaluru International Airport Limited (BIAL) as a special purpose entity, and began searching for partners. By November, the project had attracted Zürich Airport, Siemens Project Ventures and Larsen & Toubro. Construction was expected to begin in October 2002; however, governmental delays persisted. The Union Cabinet approved the project in February 2000. The concession agreement between the State Government, the Union Government and BIAL was signed in July 2004, and it required the closure of HAL Airport.

It took nearly a decade to progress from the initial stages of land allocation and acquisition, to the signing of shareholder agreements in 2002 and the start of construction.

Design

When the project was initiated, BIAL anticipated traffic of approximately 5 million passengers per annum in the first few years of operations. However, the scale of air traffic growth in the city meant that the figure was already breached by 2008. It took more than 9 months to redesign the project and gain permission for expansion. By the time the approvals for the reworked project were sanctioned, construction was half completed. Despite the challenges, BIAL expected the airport to be operational by the initially proposed date of completion.

The revised increase in capacity catered to 11 million passengers per annum, more than doubling the previous estimates. BIAL's modified plan was to build a terminal with 8 passenger boarding bridges, 1 double arm aerobridge, 9 remote bus gates and a single, 4,000-metre (13,000 ft) long runway. BIAL also planned to build an apron with 42 Code-C aircraft stands (with 8 contact stands), as well as an air and land-side road system. The estimated cost for the entire project at the time was ₹1,930 crore (US$200 million).

Construction and opening (2005–2008)

Construction commenced on 2 July 2005, and was completed in 32 months. BIAL set the launch date for 30 March 2008. However, due to delays in establishing air traffic control services at the airport, the launch date was pushed to 11 May, and further to 24 May 2008.

Public criticism arose with the opening of the new airport, mainly due to the closure of HAL Airport. In March 2008, AAI employees initiated a massive strike against the closure of HAL Airport in Bengaluru and Begumpet Airport in Hyderabad, fearing they would lose their jobs. The Bangalore City Connect Foundation, a group of citizens and businessmen, staged a rally in mid-May, claiming the new airport was too small for the latest demand projections. On 23 May, a hearing was held at the Karnataka High Court over poor connectivity between the city and the airport.

Photo: sarang · CC0 · view original

Data from OurAirports (public domain) · destinations and airlines from Wikipedia route tables (CC BY-SA, 2026), unless another source is given · profile and photo from Wikidata/Wikimedia Commons (CC0 / CC) · summary and history from Wikipedia (CC BY-SA).

Cite

To cite this page in academic work, an article or Wikipedia, choose the style and copy the reference. The access date is today.

This page was last updated on October 15, 2026

APA

Vuelopedia. (2026, October 15). Kempegowda International Airport Bengaluru (BLR). Retrieved October 16, 2026, from https://vuelopedia.org/en/airport/BLR

MLA

“Kempegowda International Airport Bengaluru (BLR).” Vuelopedia, Fundación Poderia, 15 Oct. 2026, vuelopedia.org/en/airport/BLR. Accessed 16 Oct. 2026.

Chicago

Vuelopedia. “Kempegowda International Airport Bengaluru (BLR).” Fundación Poderia. Last modified October 15, 2026. https://vuelopedia.org/en/airport/BLR.

Harvard

Vuelopedia (2026) Kempegowda International Airport Bengaluru (BLR). Available at: https://vuelopedia.org/en/airport/BLR (Accessed: 16 October 2026).

BibTeX

@misc{vuelopedia_en_airport_blr,
  author       = {{Vuelopedia}},
  title        = {{Kempegowda International Airport Bengaluru (BLR)}},
  publisher    = {Fundación Poderia},
  year         = {2026},
  date         = {2026-10-15},
  url          = {https://vuelopedia.org/en/airport/BLR},
  howpublished = {\url{https://vuelopedia.org/en/airport/BLR}},
  urldate      = {2026-10-16},
  note         = {Accessed 2026-10-16}
}

Wikipedia

{{cite web |url=https://vuelopedia.org/en/airport/BLR |title=Kempegowda International Airport Bengaluru (BLR) |website=Vuelopedia |publisher=Fundación Poderia |date=2026-10-15 |access-date=2026-10-16 |language=en}}